Construction Defects Statute Of Limitations in Utah

2 min read

Published July 14, 2026 • By DocketMath Team

Verified · 28 primary sources

This page has current canonical verification receipts.

Quoted from the source law itself. Not legal advice; confirm how it applies to your matter.

Current verified answer

Utah statute-of-limitations: statute of limitations years is 4; government notice period days is 365.

See your deadline

Authority and key facts

Citation: Utah Code § 78B-2-307

View the primary source

Verified April 29, 2026

  • Statute Of Limitations Years: 4
  • Government Notice Period Days: 365
  • Limitation Period: 4 years
  • Limitation Period: 4 years

This page provides general legal information and calculation tools, not legal advice. DocketMath is not a law firm and does not provide legal representation, and using this site does not create an attorney-client relationship. Laws change and exceptions apply, so deadlines and amounts specific to your situation should be confirmed with a licensed attorney in your jurisdiction.

Construction Defects Statute Of Limitations in Utah

Under Utah Code § 78B-2-307, a construction defect claim must be brought within four years from the date the cause of action accrues. This governing authority establishes the specific statutory limitations period for actions arising from the design, construction, or repair of improvements to real property in Utah. The statute sets out the accrual trigger and provides for certain exceptions, the details of which are found in the official source. The verified figure of four years begins to run based on the rule’s defined starting point. A worked example below illustrates how this period is applied to a hypothetical timeline. To estimate a result for a particular set of facts, use the DocketMath calculator.

Governing authority

In Utah, the statute of limitations rule is set by Utah Code § 78B-2-307. The verified packet cites Utah Code § 78B-2-307 (https://le.utah.gov/xcode/Title78B/Chapter2/C78B-2-S307.html).

Deadline example

For a Utah construction defects limitations check, use the verified limitations period from the current rule packet: 4 years. The authority packet cites Utah Code § 78B-2-307 (https://le.utah.gov/xcode/Title78B/Chapter2/C78B-2-S307.html).

Example inputs:

  • Accrual date: 2024-04-25
  • Filing date checked: 2026-04-25

Calculation:

  • Start with the accrual date.
  • Add 4 years.
  • The example deadline is 2028-04-25.

This example is generated from the verified facts packet rather than freeform prose. Confirm tolling, discovery rules, and claim-specific exceptions before relying on the date.

Estimate your own result: every situation has exceptions that can change the outcome. Use the construction defects statute of limitations calculator to estimate your specific figure.

This page provides general legal information and calculation tools, not legal advice. DocketMath is not a law firm and does not provide legal representation, and using this site does not create an attorney-client relationship. Laws change and exceptions apply, so deadlines and amounts specific to your situation should be confirmed with a licensed attorney in your jurisdiction.